At the October 20, 2022 BPAC meeting, OakDOT Senior Transportation Planner, Audrey Harris, provided an overview of the TOWN projects, a suite of infrastructure improvements that will provide safer, more sustainable and more equitable access between Downtown, Chinatown, and West Oakland and the waterfront while protecting and enhancing goods movement in and out of the nearby Port of Oakland. The TOWN projects have also been designed to facilitate access to and from the proposed Waterfront Ballpark District at Howard Terminal which if approved, would deliver an urban infill project that proposes to build a new ballpark, up to 3,000 new housing units, 1.7 million square feet of commercial space, a 400-room hotel, a 3,500-seat performance venue, and 18 acres of open space, including an extension to the Bay Trail.
An excerpt is below, followed by the full presentation.
At the October 20, 2022 BPAC meeting, OakDOT’s Safe Streets Division Manager Megan Wier, Supervising Transportation Engineer Joe Wang, and Transportation Engineers Mandana Ashti and Brian Sukkar provided an overview of OakDOT’s Rapid Response to fatal traffic crashes.
Oakland Police Department’s Lieutenant Fleming and Sergeant Bellusa also shared information regarding OPD’s crash investigations, which inform OakDOT rapid responses.
OakDOT staff also shared two case studies of rapid responses to recent crashes involving people walking and biking.
An excerpt of the presentation is below, followed by the full presentation.
Survey on Oakland as a Bicycle Friendly Community — Survey deadline is on Nov. 6
Citywide Bikeways 2021- Construction completed
AB43 Implementation
Traffic Fatalities Tracking
Paint the Town Murals: A Paint the Town mural was painted by Seyed Alavi and neighbors on September 11-12, 2022, in the intersection of Dover St and 56th St.
At the September 15, 2022 BPAC meeting, Matthew Bomberg, Alameda County Transportation Commission (Alameda CTC) Senior Transportation Engineer, will provide a presentation on the East Bay Greenway project, a regional active transportation project being planned and implemented by Alameda CTC in partnership with the City of Oakland. The project is identified in local and regional plans, including the City’s Bike Master Plan and Measure BB Transportation Expenditure Plan. Alameda CTC is currently developing conceptual plans and conducting community engagement and environmental studies for an East Bay Greenway project which can be implemented in a near-term (3-5 year) timeframe.
Virtual Meeting on 09/21/22 for Caltrans I-580 Pedestrian Overcrossing Project — Release of Draft Environmental Document. Comments on the draft environmental document are due October 5.
Park Boulevard Complete Streets Project – Construction substantially complete
West Street Road Diet Project – Construction substantially complete
We [bike] Oakland Newsletter, Summer 2022 (31st Edition)
Paint the Town Murals: 1 upcoming mural on Dover/56th St
At the August 18, 2022 BPAC meeting, Julieth Ortiz, OakDOT Transportation Planner, shared an overview of the crash data-driven HSIP grant program and the current proposals to request funds to implement HSIP-eligible countermeasures that focus on intersection safety for pedestrians and bicyclists. The applications are due September 12th. Following the overview of the grant program, Dean Hsiao, OakDOT Supervising Transportation Engineer, shared an overview of pedestrian signals and leading pedestrian intervals (LPIs).
HSIP Cycle 11 Applications
Safe Oakland Streets Leading Pedestrian Interval (LPI) Timing
Safe Oakland Streets Major Bike and Pedestrian Crossings
At the August 18, 2022 BPAC meeting, Kerby Olsen, New Mobility Supervisor at OakDOT, presented on the department’s draft proposal to address sidewalk parking through a combination of community outreach and education, street modifications and parking enforcement.
An excerpt is below, followed by the full presentation.