Transforming Oakland’s Waterfront Neighborhoods (TOWN) Project

At the October 20, 2022 BPAC meeting, OakDOT Senior Transportation Planner, Audrey Harris, provided an overview of the TOWN projects, a suite of infrastructure improvements that will provide safer, more sustainable and more equitable access between Downtown, Chinatown, and West Oakland and the waterfront while protecting and enhancing goods movement in and out of the nearby Port of Oakland. The TOWN projects have also been designed to facilitate access to and from the proposed Waterfront Ballpark District at Howard Terminal which if approved, would deliver an urban infill project that proposes to build a new ballpark, up to 3,000 new housing units, 1.7 million square feet of commercial space, a 400-room hotel, a 3,500-seat performance venue, and 18 acres of open space, including an extension to the Bay Trail.

An excerpt is below, followed by the full presentation.

Read More

OakDOT Rapid Responses to Fatal Crashes

At the October 20, 2022 BPAC meeting, OakDOT’s Safe Streets Division Manager Megan Wier, Supervising Transportation Engineer Joe Wang, and Transportation Engineers Mandana Ashti and Brian Sukkar provided an overview of OakDOT’s Rapid Response to fatal traffic crashes.

Oakland Police Department’s Lieutenant Fleming and Sergeant Bellusa also shared information regarding OPD’s crash investigations, which inform OakDOT rapid responses.

OakDOT staff also shared two case studies of rapid responses to recent crashes involving people walking and biking.

An excerpt of the presentation is below, followed by the full presentation.

Read More

October 2022 BPAC Agenda

Thursday, October 20, 2022; 6:00-8:00 pm, online and by phone.

Agenda topics include:

  • Recognizing and Thanking Dave Campbell
  • Recent Bicyclist and Pedestrian Related Crashes
  • OakDOT Rapid Responses to Fatal Crashes
  • Transforming Oakland’s Waterfront Neighborhoods (TOWN) Project

Announcements:

  • BPAC Agenda Sign-Up List
  • Survey on Oakland as a Bicycle Friendly Community — Survey deadline is on Nov. 6
  • Citywide Bikeways 2021- Construction completed
  • AB43 Implementation
  • Traffic Fatalities Tracking
  • Paint the Town Murals: A Paint the Town mural was painted by Seyed Alavi and neighbors on September 11-12, 2022, in the intersection of Dover St and 56th St.
  • Coordinated Street Furniture Program
  • OakDOT Major Projects Map Updates
  • Bicycle Facilities Map Update

More details below.

Read More

East Bay Greenway – Updated Design

At the September 15, 2022 BPAC meeting, Matthew Bomberg, Alameda County Transportation Commission (Alameda CTC) Senior Transportation Engineer, will provide a presentation on the East Bay Greenway project, a regional active transportation project being planned and implemented by Alameda CTC in partnership with the City of Oakland. The project is identified in local and regional plans, including the City’s Bike Master Plan and Measure BB Transportation Expenditure Plan. Alameda CTC is currently developing conceptual plans and conducting community engagement and environmental studies for an East Bay Greenway project which can be implemented in a near-term (3-5 year) timeframe.

The full presentation is below.

Read More

Transport Oakland Happy Hour

Transport Oakland is hosting their September Happy Hour on Wednesday, September 28, 2022 at 5:30 – 7:30pm at the Double Standard (2424 Telegraph Ave).

“Come mingle with fellow transporters and help us welcome Oakland’s new Director of Transportation Fred Kelley.”

RSVP here.

Read More

September 2022 BPAC Agenda

Thursday, September 15, 2022; 6:00-8:00 pm, online and by phone.

Agenda topics include:

  • Recent Bicyclist and Pedestrian Related Crashes
  • OakDOT Director Fred Kelley and Assistant Director Ariel Espiritu Santo
  • East Bay Greenway Updated Design​

Announcements:

  • BPAC Agenda Sign-Up List
  • Virtual Meeting on 09/21/22 for Caltrans I-580 Pedestrian Overcrossing Project — Release of Draft Environmental Document. Comments on the draft environmental document are due October 5.
  • Park Boulevard Complete Streets Project – Construction substantially complete
  • West Street Road Diet Project – Construction substantially complete
  • We [bike] Oakland Newsletter, Summer 2022 (31st Edition)
  • Paint the Town Murals: 1 upcoming mural on Dover/56th St
  • West Oakland Bay Trail Realignment
  • Safe Oakland Streets (SOS) info cards
  • Park Blvd at E 38th Ave Rapid Response

More details below.

Read More

September 2022 Infrastructure Committee Meeting

The BPAC Infrastructure Committee meeting will be held on Thursday, September 1, 2022, 3:30-4:30pm online and by phone.
Agenda topics include:

  • HSIP applications support/discussion
  • Slow Streets/Neighborhood Bike Routes (NBRs)
  • Relations of Bike/Ped Plan to EJ and Safety Elements in the General Plan Update
Read More

OakDOT Applications to Highway Safety Improvement Program (HSIP) Grant Cycle 11

At the August 18, 2022 BPAC meeting, Julieth Ortiz, OakDOT Transportation Planner, shared an overview of the crash data-driven HSIP grant program and the current proposals to request funds to implement HSIP-eligible countermeasures that focus on intersection safety for pedestrians and bicyclists. The applications are due September 12th. Following the overview of the grant program, Dean Hsiao, OakDOT Supervising Transportation Engineer, shared an overview of pedestrian signals and leading pedestrian intervals (LPIs).

HSIP Cycle 11 Applications

  1. Safe Oakland Streets Leading Pedestrian Interval (LPI) Timing
  2. Safe Oakland Streets Major Bike and Pedestrian Crossings

The full presentation is below.

Read More

Sidewalk Parking

At the August 18, 2022 BPAC meeting, Kerby Olsen, New Mobility Supervisor at OakDOT, presented on the department’s draft proposal to address sidewalk parking through a combination of community outreach and education, street modifications and parking enforcement.

An excerpt is below, followed by the full presentation.

Read More

August 2022 BPAC Agenda

Thursday, August 18, 2022; 6:00-8:00 pm, online and by phone.

Agenda topics include:

  • Recent Bicyclist and Pedestrian Related Crashes
  • Sidewalk Blocking
  • OakDOT Applications to Highway Safety Improvement Program (HSIP) Grant Cycle 11​

Announcements:

  • BPAC Agenda Sign-Up List
  • 11th Ave/E 19th St Diagonal Diverter Bicycle Passageway
  • Paint the Town Murals: 1 upcoming mural on 18th St between San Pablo Ave and Telegraph Ave on August 27th and 28th
  • Highway Safety Improvement Program (HSIP 8) Fruitvale Ave Project
  • Sideshow Prevention Pilot – 42nd Avenue/I-880 On-Ramp (The Pit)
  • International Boulevard and 16th Ave Rapid Response
  • 15 MPH Signage at Schools

More details below.

Read More