Annual Report from Strategic Planning

At the June 17, 2021 BPAC meeting, Laura Kaminski, Acting Strategic Planning Manager, gave an update on existing and new projects including: the Downtown Oakland Specific Plan, an Impact Fee Update, and a General Plan Update.

Downtown Oakland Specific Plan (DOSP) — Mobility Objectives:

  • Improve access and safety for pedestrians;
  • Create a world-class transit network linking Oaklanders to downtown
  • Develop a connected network of low-stress bicycling facilities
  • See map (in presentation) of Proposed Low-Stress Short-Term and Vision Bicycle Networks

Transportation Impact Fee 5-Year Update:

  • Update fee schedule from 2016 nexus study based on inflation along with Appendix B – what is necessary to fund cumulative CEQA traffic mitigation costs.
  • Provide additional fee schedule to fund list of potential citywide transportation projects not included in Appendix B.
  • Provide additional fee schedules to fund list of specified transportation projects included in the (1) Downtown Specific Plan (DOSP) and (2) Waterfront Ballpark District at Howard Terminal Project (offsite transportation projects, not direct impacts of Howard Terminal project)

General Plan Update Schedule

  • 2021 spring and summer: Approach and Consultant Team Selection
    • General Plan Update Memo
    • RFP for Consultant Team (Council – September)
    • Backbone CBO as part of consultant team
  • 2021 fall: Official Kick-off
  • 2023, January: Adoption of Housing, Safety, and Environmental Justice Element
  • 2025, July: Adoption of Land Use, Transportation, Noise, Open Space, Conservation, and Recreation Elements

The full presentation is below.

Read More

Telegraph Avenue Complete Streets Project, 20th-29th Street

At the June 17, 2021 BPAC meeting, Ryan Russo, Director of the Oakland Department of Transportation (OakDOT), presented a brief history of bike facilities on Telegraph Avenue in Koreatown Northgate (KONO); provided an overview of what we’ve learned since the installation of an interim project in 2016; and presented an overview of the proposed recommendation to install enhanced buffered bike lanes with active curb management, which City Council will consider later this month. Director Russo shared how the public can continue participating in the Telegraph Avenue Complete Streets Project.

What we’ve learned (2013-2019)

  • The good:
    • The number of people walking and biking doubled
    • People driving are three times more likely to yield to people crossing the street
    • People walking and biking report feeling safer with the bike lane than with the five-lane condition
    • Motor vehicle volumes have remained steady, but 85th percentile speeds have decreased closer to the posted speed limit of 25 mph
  • The less good:
    • Reported collisions involving people walking and biking increased by 33%
    • People driving park in the bike lane
    • Bike lane and intersection visibility concerns
    • Pedestrian visibility concerns
    • Anecdotal reports of increased near-miss collisions
    • Maintenance challenges
    • Businesses report negative impacts
    • Aesthetic concerns

The full presentation and summary of discussion are below.

Read More

Oakland RAISE – I-880 Freeway Green Infrastructure Retrofit and Active Transit Corridor Planning

At the June 17, 2021 BPAC meeting, BPAC Commissioner David Ralston will announce an upcoming Rebuilding American Infrastructure with Sustainability and Equity (RAISE) federal planning grant opportunity to support green infrastructure and active transit connections along the I-880 corridor in East Oakland. This plan would include potential freeway lid crossings to provide equitable access for East Oaklanders to the Bay Trail and waterfront as well as co-beneficial emission reduction and carbon capture opportunities. Ralston will be seeking a letter of support from the BPAC.

Project background

The Bay Area Air Quality Management District (BAAQMD), working with regional partners such as MTC and the State DOT, is preparing a planning grant application for this year’s round of federal RAISE infrastructure funding. The RAISE program (Rebuilding American Infrastructure with Sustainability and Equity) is a federal grants program previously known as BUILD. This program provides $1 billion in federal FY 2021 discretionary grant funding for capital projects and planning projects.

The proposed planning project focuses on the heavy-diesel “goods movement” corridor of the I-880 Freeway as it passes through the severely impacted environmentally justice disadvantaged communities of greater East Oakland (Estuary to 105th Ave., an approximately 5-6-mile segment). The project will undertake planning feasibility, technical assessments, and conceptual-development designs for utilizing Caltrans (State) ROW along this corridor for the innovative installation of co-beneficial green infrastructure that can:

  • Mitigate/reduce PM, Black Carbon and other Diesel emissions (as well as noise) to adjacent communities; 
  • Sequester carbon and GHG from vehicular traffic;
  • Provide vegetative canopy to reduce urban heat island;
  • Enhance the capacity of groundwater recharge and provide flooding mitigation;
  • Enable and fill key active transit network gaps (such as connections between local neighborhoods, the East Bay Greenway and the Bay Trail);
  • Provide opportunity for green jobs works programs.

More info below.

Read More

June 2021 BPAC Agenda

Thursday, June 17, 2021; 6:00-8:00 pm, online and by phone.

Agenda topics include:

  • Bike to Wherever Day Report-Back
  • Annual Report from Strategic Planning
  • Telegraph Avenue Complete Streets Project, 20th Street to 29th Street
  • Oakland RAISE – I-880 Freeway Green Infrastructure Retrofit and Active Transit Corridor Planning
  • Committee Report-Back

Announcements:

  • Neighborhood Bike Route Implementation Guide:
    A guide outlining how OakDOT will implement bike plan recommendations for “neighborhood bike routes” (also known as “bicycle boulevards”) has been published online here [PDF]. The guide was completed by the Bicycle & Pedestrian Program with input from the Bicyclist & Pedestrian Advisory Commission’s Infrastructure Committee and other OakDOT sections including Traffic Engineering, Paving and Sidewalks, and Planning and Project Development. The Guide describes implementation in the following five subject areas: Scoping & Monitoring, Route Establishment, Traffic Calming, Traffic Control, and Public Notification & Comment.

More details below.

Read More

ACTC Rapid Response Projects follow-up discussion

At the June 3rd, 2021 BPAC Infrastructure Committee meeting, OakDOT staff Jason Patton and Jason Cook gave a presentation on the ACTC Rapid Response Projects and led a discussion to follow up on these projects.

Grant info

$75k Grant with $75k Local Match ($150,000 total) for quick-build transportation improvement projects that support improvements to the Rapid Response locations, Essential Places Locations, and a curbside buffered bike lane upgrade. Deadline for completion is June 30, 2021.

More info: Alameda County Transportation Commission – COVID-19 Rapid Response Bicycle and Pedestrian Grant Program

Discussion questions

  1. Hardened centerlines are a new design treatment in the toolkit. Where will this treatment be most beneficial? How should the many possible locations be prioritized?
  2. What are lessons learned from the vertical separation installed along the bike lanes on Embarcadero?
  3. Plastic is not a great building material. Under what circumstances should it be used?
  4. Quick-Build” and “Community Engagement” may be incompatible goals. Under what circumstances does one take priority over the other?

The presentation and discussion notes are below.

Read More

2021 Citywide Striping Project

In early May, OakDOT staff Jason Cook shared the 2021 Citywide Striping Project draft plans with the BPAC Infrastructure Committee. These plans were shared through email and not presented at an Infrastructure Committee meeting.

“The 2021 Citywide Striping Project consists of a series of enhancements and green markings to existing bike lanes throughout Oakland. We had funding become available that needs to be encumbered before the end of the fiscal year and saw this as an opportunity to put together a striping project.” –Jason Cook

“These are relatively small projects, mostly filling in bikeway gaps or adding on to and upgrading existing bike lanes. These projects do not include paving, curb ramps, posts, or other non-striping elements.” –Robert Prinz (Infrastructure Committee co-chair)

The project areas are:

  • 35th Ave from International Blvd to Foothill Blvd
  • MacArthur Blvd from Boston Ave to Coolidge Ave
  • Washington St from 2nd St to 9th St
  • Market St at 7th St
  • E 12th St at 16th Ave
  • E 12th St at 22nd Ave
  • E 12th St at 29th Ave
  • W MacArthur Blvd from San Pablo Ave to 500ft west of Market St

The draft striping plan and comments by Robert Prinz and Dianne Yee are below.

Read More

Safe Oakland Streets: CA Assembly Bills 43 and 550

At the May 20, 2021 BPAC meeting, Nicole Ferrara, OakDOT’s Policy & Intergovernmental Affairs Advisor, presented on and shared ways the BPAC can support two bills aimed at reducing dangerous speeding on California roadways that the State Legislature is considering: Assembly Bill AB 43 (Friedman): Speed Limit Setting, and AB 550 (Chiu): Speed Safety Systems. Both bills would implement Safe Oakland Streets (SOS) strategies, and the bills have been supported by City Council and the Mayor.

Safe Oakland Streets: Goals

  1. Prevent severe and fatal crashes and related disparities impacting Black, Indigenous, and People of Color (BIPOC) communities, seniors, people with disabilities and low-income populations
  2. Eliminate severe and fatal injury inequities including racial disparities impacting BIPOC communities that exist today in Oakland
  3. Inform effective and equitable safety strategies that prevent injury and injury inequities, and do not have adverse equity impacts on BIPOC communities, seniors, and low-income populations

Current status of state legislation

  • AB 43 passed out of the Assembly and heads to the Senate.
  • AB 550 was held in Assembly Appropriations today (May 20, 2021) and won’t advance this year.
  • BPAC can submit a letter of support for AB 43

The full presentation is below.

Read More

E-Scooter Program Update

At the May 20, 2021 BPAC meeting, Kerby Olsen, New Mobility Supervisor, gave a quick update on the E-scooter program and introduced two of the three new permitted operators: SPIN, VeoRide and LINK. Seymond Sumulong, Construction Inspector, gave an update on E-scooter parking enforcement and the effectiveness of the locking requirement.

Scooters with locking devices

Starting November 2020, shared e-scooters were required to lock to a bike rack, in-street corral or City street signs when not in use.

  • Before the locking devices were required, there were an average of 37 issues that were reported in OAK311 per month and an average 8 per month resulted to fines.
  • After the locking devices were required, there were an average of 32 issues that were reported in OAK311 per month and an average 0 per month resulted to fines.
    • Issues reported were down by 15%

The full presentation is below.